Chatswood Ramp
Cored lifting holes into concrete slabs / wall shaved and wire sawed /
cutting into manageable slabs / lifting concrete into waste bins
Click onto images to enlarge their view.
Core Drilling 700 mm diameter drilled hole in progress / stitch drilling / large footing
Click onto images to enlarge their view.
Cotter Dam
This project saw the removal of mass concrete from top section
of dam-650 cubic metres of concrete was removed
Click onto images to enlarge their view.
Crusher Silent demolition work / wall crushing in progress
Click onto images to enlarge their view.
Homebush Bay Project involved wire sawing & splitting of beam
Click onto images to enlarge their view.
Invert Coring Coring out a crushed stormwater drain
Click onto images to enlarge their view.
Port Kembla Coal Loading Terminal Removal of 70 meters of wharf / wire sawing of heavily reinforced concrete beams
lifting out / project involved heavy lifts of 90 tonne each of block weights
Click onto images to enlarge their view.
Road Sawing
Click onto images to enlarge their view.
Wall Sawing
Click onto images to enlarge their view.
Warragamba Dam And Wivenhoe Dams Both work projects involved upgrades and drilling 950 mm diameter holes
in existing training walls and spillways for anchor heads